-
2022 Terminal Planning Study for ISP
-
FAA Letter dated January 30, 2023 regarding a proposed North Airport Terminal
-
FAA Advisory Circular with requirements for Airport Terminal Planning
-
ISP Operations data
-
The Airport’s Minimum Standards for fixed base operators
-
The Airport’s Rules and Regulations
-
ISP’s Airport Layout Plan with maps showing the layout airport, including runway approaches and other technical data
-
-
-
A map from the ALP identifying the airport layout and other facilities
-
ISP’s State Pollutant Elimination System permit
-
Map showing North Development Area and location of the Existing Terminal
-
Phase I Environmental Site Assessment for the compost facility
-
Map identifying roads adjacent to or related to the North Development Area
-
Map identifying various important locations around the North Development Area
-
Map with utilities and other runway/FAA-related infrastructure identified
-
Map identifying land ownership around the North Development Area
-
-
Map with elevation contour lines around the North Development Area
-
Map identifying land ownership surrounding Ronkonkoma Train Station
-
Town Best Management Practices Plan for compliance with the New York State Pollution Discharge Elimination System program.